Electricity prices and bills, generation and fuel mix, and gasoline costs.
Residential electricity price12.32¢/kWh2024 · #43 of 50 · highest first
Regular gasoline price$3.605/gal2026-08 · #43 of 48* · highest first
Average monthly residential electricity bill$129.132024 · #32 of 50 · highest first
Arkansas over time
Explore Arkansas readings, major events and reviewed actions on the same date scale. Arkansas officeholders appear in separate lanes. National event evidence describes national context; it does not measure a Arkansas effect.
Major events & context · A curated selection, including uncertain effects. Milestone dates do not establish that an event caused a Arkansas change.
Enacted / issuedDid not proceedPending / in progressStatus unclear
Colors show the latest recorded status. Passing one chamber is not enactment. A number groups actions with the same date, body and status.
Residential electricity price Arkansas · source units
ArkansasPublished U.S. benchmark
Move across the chart to inspect the nearest observation. Click or tap to keep a reading selected, or focus the chart and use the arrow keys. Hover over or focus a marker to explore; click or tap to pin. Press Escape to clear.
4 of 4 reviewed Arkansas actions match · 4 date markers shown. 50 major events shown separately.
Arkansas · 2024: 12.32¢/kWh · Rank #43 of 50, highest first · U.S. benchmark: 16.48¢/kWh
For 2024, FactVote combines EIA utility-scale net generation with EIA's estimated small-scale solar generation and groups sources into seven categories. The 2015–2023 historical points retain utility-scale coverage. The residential price is EIA's annual average revenue per kilowatthour and includes generation, transmission, distribution, taxes, and fees reflected in electric bills. Generation is electricity produced inside Arkansas, not electricity consumed there; interstate imports and exports are not represented. The 2024 comparison includes EIA's estimated generation from small-scale solar systems under 1 megawatt. Historical points for 2015–2023 retain utility-scale coverage and exclude those estimates, so comparisons across 2023–2024 also reflect this change in coverage. Hydroelectric combines conventional and pumped-storage net generation; the 'other' category is the residual of remaining reported energy sources. The residential price is a statewide nominal average and can mask large differences among utilities, plans, and household usage. Annual observations use December 31; monthly observations use the first of the month. Lines connect consecutive readings and do not supply values between them. Missing observations break the lines.
View observations and export data
Arkansas Residential electricity price · source units
The timeline combines the corresponding national fact’s reviewed event catalog, labeled National context, with individually reviewed state milestones. State events use primary sources and distinguish signing, effective and filing dates. Each milestone keeps its source-check date, geographical limits and evidence limits. This curated selection is not a complete history.
Date ranges affect events and actions. Action type, status and official-name search affect government records only. Events remain separate from action counts. An event after the latest observation extends context without creating a new reading.
Arkansas · state comparison
Household energy prices
Unit prices are separate from bills: usage, weather, and household needs also determine spending.
Arkansas · 202412.32¢/kWh
Arkansas rank#43among all 50 states
U.S. benchmark16.48¢/kWhSame measure and period when published
#1 is the highest value. Ties share a rank and leave gaps. D.C. and territories are excluded. Rank describes the measured value; it is not an overall score of the state.
Residential electricity price
For 2024, FactVote combines EIA utility-scale net generation with EIA's estimated small-scale solar generation and groups sources into seven categories. The 2015–2023 historical points retain utility-scale coverage. The residential price is EIA's annual average revenue per kilowatthour and includes generation, transmission, distribution, taxes, and fees reflected in electric bills.
Generation is electricity produced inside Arkansas, not electricity consumed there; interstate imports and exports are not represented. The 2024 comparison includes EIA's estimated generation from small-scale solar systems under 1 megawatt. Historical points for 2015–2023 retain utility-scale coverage and exclude those estimates, so comparisons across 2023–2024 also reflect this change in coverage. Hydroelectric combines conventional and pumped-storage net generation; the 'other' category is the residual of remaining reported energy sources. The residential price is a statewide nominal average and can mask large differences among utilities, plans, and household usage.
Hover to inspect. Click or tap to compare that period with every state. Focus the graph and use arrow keys, Home or End to select a period. Press Escape to return to the latest period.
Arkansas
2024 · Arkansas: 12.32¢/kWh · Rank #43 of 50, highest first · U.S. benchmark: 16.48¢/kWh · Selected for state comparisonView history and select a period
Arkansas Residential electricity price history
Period
Arkansas
Compare
2015
9.82¢/kWh
2016
9.92¢/kWh
2017
10.28¢/kWh
2018
9.81¢/kWh
2019
9.8¢/kWh
2020
10.41¢/kWh
2021
11.27¢/kWh
2022
12.05¢/kWh
2023
12.25¢/kWh
2024
12.32¢/kWh
Compare states on the graph
Hover or focus a bar to inspect its value and rank. Use the up and down arrows, Home or End to explore states. Click, tap or press Enter to keep a state selected. Arkansas stays highlighted. Values use the same measure and period.
Explore the map: hover or focus a state to inspect it, then click or tap to select it. Arrow keys move between states alphabetically. Arkansas has a dark outline.
Lower value · 11.51¢/kWhHigher value · 42.86¢/kWhStriped: unavailable
Color shows this measure’s value, not an overall state score. Select a state on the map, graph or dropdown to read its value, rank and comparison limits below.
Arkansas · 12.32¢/kWh2024 · Rank #43 of 50, highest firstSelected state
50 states shown · scroll to explore every state. Missing values have no bar and are excluded from ranks. Bars start at zero; #1 means the highest value.
Compare Arkansas with every state · 50 ranked
Residential electricity price · 2024 · highest value ranked #1
Rank
State
Value
Comparison notes
#1
Hawaii
42.86¢/kWh
—
#2
California
31.97¢/kWh
—
#3
Massachusetts
29.35¢/kWh
—
#4
Connecticut
28.75¢/kWh
—
#5
Rhode Island
28.65¢/kWh
—
#6
Alaska
24.82¢/kWh
—
#7
New York
24.43¢/kWh
—
#8
Maine
24.29¢/kWh
—
#9
New Hampshire
23.4¢/kWh
—
#10
Vermont
21.9¢/kWh
—
#11
New Jersey
19.34¢/kWh
—
#12
Michigan
19.3¢/kWh
—
#13
Maryland
17.86¢/kWh
—
#14
Pennsylvania
17.77¢/kWh
—
#15
Wisconsin
17.18¢/kWh
—
#16
Delaware
16.57¢/kWh
—
#17
Ohio
15.99¢/kWh
—
#18
Illinois
15.87¢/kWh
—
#19
Minnesota
15.45¢/kWh
—
#20
Alabama
15.18¢/kWh
—
#21
West Virginia
15.07¢/kWh
—
#22
Nevada
15¢/kWh
—
#23
Texas
14.94¢/kWh
—
#24
Colorado
14.92¢/kWh
—
#25
Arizona
14.91¢/kWh
—
#26
Indiana
14.77¢/kWh
—
#27
Oregon
14.7¢/kWh
—
#28
Virginia
14.41¢/kWh
—
#29
South Carolina
14.23¢/kWh
—
#30
New Mexico
14.2¢/kWh
—
#31
Kansas
14.15¢/kWh
—
#32
Florida
14.14¢/kWh
—
#33
North Carolina
14.13¢/kWh
—
#34
Georgia
14.08¢/kWh
—
#35
Iowa
13.4¢/kWh
—
#36
Mississippi
13.39¢/kWh
—
#37
Missouri
12.91¢/kWh
—
#38
South Dakota
12.86¢/kWh
—
#39
Kentucky
12.79¢/kWh
—
#40
Montana
12.66¢/kWh
—
#41
Wyoming
12.47¢/kWh
—
#42
Tennessee
12.42¢/kWh
—
#43
Arkansas · your comparison
12.32¢/kWh
—
#44
Oklahoma
12.24¢/kWh
—
#45
Utah
12.22¢/kWh
—
#46
Washington
11.9¢/kWh
—
#47
Louisiana
11.73¢/kWh
—
#48
Nebraska
11.53¢/kWh
—
#49
Idaho
11.52¢/kWh
—
#50
North Dakota
11.51¢/kWh
—
All 50 states are listed, including states without a comparable observation. Ranks use stored source precision; displayed values may round to the same number.
Estimated average retail price of regular-grade gasoline across all formulations in EIA's Gulf Coast region, including taxes. The region contains Alabama, Arkansas, Louisiana, Mississippi, New Mexico, and Texas.
This source snapshot keeps its own definition and period. A rank shown elsewhere applies only to that comparison’s measure and period.
Recent EIA observations
Prior week
$3.638/gal
Weekly change
-2.0¢
One year earlier
$2.765/gal
Change from one year earlier
+85.3¢
Method and limitations
FactVote uses EIA’s Gulf Coast series, the smallest current EIA retail region that includes Arkansas. Changes are calculated from the published August 24, 2026 (prior week), and September 1, 2025 (52 weeks earlier), observations.
EIA does not publish a current Arkansas statewide weekly gasoline-price series. This Gulf Coast regional estimate should not be read as Arkansas’s statewide average.
The regional average combines Alabama, Arkansas, Louisiana, Mississippi, New Mexico, and Texas, and does not represent the price at every station or in every Arkansas community.
Prices are nominal and not adjusted for inflation or seasonal patterns. Weekly estimates can be revised and can differ from monthly averages.
Price changes alone do not establish the effect of any bill, official, or government action.
Compare the bill, electricity used, and price per unit for the same year.
Arkansas · 2024$129.13
Arkansas rank#32among all 50 states
U.S. benchmark$142.26Same measure and period when published
#1 is the highest value. Ties share a rank and leave gaps. D.C. and territories are excluded. Rank describes the measured value; it is not an overall score of the state.
Average monthly residential electricity bill
State residential revenue and sales divided by customer accounts, averaged across the year.
Bills describe average customer accounts rather than a particular household. Dollars are nominal; usage reflects climate and building characteristics as well as efficiency.
Hover to inspect. Click or tap to compare that period with every state. Focus the graph and use arrow keys, Home or End to select a period. Press Escape to return to the latest period.
Arkansas
2024 · Arkansas: $129.13 · Rank #32 of 50, highest first · U.S. benchmark: $142.26 · Selected for state comparisonView history and select a period
Arkansas Average monthly residential electricity bill history
Period
Arkansas
Compare
2010
$107.28
2011
$106.27
2012
$104.14
2013
$108.64
2014
$108.63
2015
$110.22
2016
$107.44
2017
$105.64
2018
$113.36
2019
$109.46
2020
$110.33
2021
$123.69
2022
$133.78
2023
$128.51
2024
$129.13
Compare states on the graph
Hover or focus a bar to inspect its value and rank. Use the up and down arrows, Home or End to explore states. Click, tap or press Enter to keep a state selected. Arkansas stays highlighted. Values use the same measure and period.
Explore the map: hover or focus a state to inspect it, then click or tap to select it. Arrow keys move between states alphabetically. Arkansas has a dark outline.
Lower value · $92.88Higher value · $212.12Striped: unavailable
Color shows this measure’s value, not an overall state score. Select a state on the map, graph or dropdown to read its value, rank and comparison limits below.
Arkansas · $129.132024 · Rank #32 of 50, highest firstSelected state
50 states shown · scroll to explore every state. Missing values have no bar and are excluded from ranks. Bars start at zero; #1 means the highest value.
Compare Arkansas with every state · 50 ranked
Average monthly residential electricity bill · 2024 · highest value ranked #1
Rank
State
Value
Comparison notes
#1
Hawaii
$212.12
—
#2
Connecticut
$199.66
—
#3
Alabama
$173.5
—
#4
Massachusetts
$167.2
—
#5
Maryland
$165.87
—
#6
Texas
$163.72
—
#7
Rhode Island
$162.4
—
#8
California
$160.86
—
#9
Arizona
$160.24
—
#10
Florida
$156.09
—
#11
Mississippi
$154.83
—
#12
West Virginia
$154.76
—
#13
Georgia
$151.25
—
#14
Delaware
$150.87
—
#15
South Carolina
$149.51
—
#16
Virginia
$148.77
—
#17
Pennsylvania
$145.17
—
#18
New Hampshire
$144.87
—
#19
Alaska
$143.54
—
#20
North Carolina
$143.5
—
#21
Tennessee
$143.32
—
#22
Louisiana
$140.96
—
#23
New York
$139.53
—
#24
Nevada
$139.39
—
#25
Ohio
$135.16
—
#26
Kentucky
$133.81
—
#27
Maine
$133.6
—
#28
Indiana
$133.06
—
#29
Oklahoma
$132.05
—
#30
Oregon
$129.62
—
#31
Missouri
$129.18
—
#32
Arkansas · your comparison
$129.13
—
#33
New Jersey
$128.13
—
#34
South Dakota
$127.81
—
#35
Vermont
$125.66
—
#36
Kansas
$123.9
—
#37
Michigan
$119.31
—
#38
North Dakota
$118.38
—
#39
Washington
$113.68
—
#40
Iowa
$111.54
—
#41
Wisconsin
$110.87
—
#42
Nebraska
$110.28
—
#43
Minnesota
$110.06
—
#44
Illinois
$109.99
—
#45
Idaho
$108.73
—
#46
Montana
$107.91
—
#47
Wyoming
$107.65
—
#48
Colorado
$100.57
—
#49
Utah
$94.57
—
#50
New Mexico
$92.88
—
All 50 states are listed, including states without a comparable observation. Ranks use stored source precision; displayed values may round to the same number.
Compare total generation and each fuel’s share using the same EIA year. A fuel share is not a performance score.
Arkansas · 202462.1 TWh
Arkansas rank#27among all 50 states
U.S. benchmarkNot availableSame measure and period when published
#1 is the highest value. Ties share a rank and leave gaps. D.C. and territories are excluded. Rank describes the measured value; it is not an overall score of the state.
Total electricity generation
For 2024, FactVote combines EIA utility-scale net generation with EIA's estimated small-scale solar generation and groups sources into seven categories. The 2015–2023 historical points retain utility-scale coverage. The residential price is EIA's annual average revenue per kilowatthour and includes generation, transmission, distribution, taxes, and fees reflected in electric bills.
Generation is electricity produced inside Arkansas, not electricity consumed there; interstate imports and exports are not represented. The 2024 comparison includes EIA's estimated generation from small-scale solar systems under 1 megawatt. Historical points for 2015–2023 retain utility-scale coverage and exclude those estimates, so comparisons across 2023–2024 also reflect this change in coverage. Hydroelectric combines conventional and pumped-storage net generation; the 'other' category is the residual of remaining reported energy sources. The residential price is a statewide nominal average and can mask large differences among utilities, plans, and household usage.
Hover to inspect. Click or tap to compare that period with every state. Focus the graph and use arrow keys, Home or End to select a period. Press Escape to return to the latest period.
Arkansas
2024 · Arkansas: 62.1 TWh · Rank #27 of 50, highest first · Selected for state comparisonView history and select a period
Arkansas Total electricity generation history
Period
Arkansas
Compare
2015
55.6 TWh
2016
60.4 TWh
2017
60.8 TWh
2018
68 TWh
2019
64.4 TWh
2020
54.6 TWh
2021
61.1 TWh
2022
65.9 TWh
2023
63.2 TWh
2024
62.1 TWh
Compare states on the graph
Hover or focus a bar to inspect its value and rank. Use the up and down arrows, Home or End to explore states. Click, tap or press Enter to keep a state selected. Arkansas stays highlighted. Values use the same measure and period.
Explore the map: hover or focus a state to inspect it, then click or tap to select it. Arrow keys move between states alphabetically. Arkansas has a dark outline.
Lower value · 2.5 TWhHigher value · 571.5 TWhStriped: unavailable
Color shows this measure’s value, not an overall state score. Select a state on the map, graph or dropdown to read its value, rank and comparison limits below.
Arkansas · 62.1 TWh2024 · Rank #27 of 50, highest firstSelected state
50 states shown · scroll to explore every state. Missing values have no bar and are excluded from ranks. Bars start at zero; #1 means the highest value.
Compare Arkansas with every state · 50 ranked
Total electricity generation · 2024 · highest value ranked #1
Rank
State
Value
Comparison notes
#1
Texas
571.5 TWh
—
#2
Florida
270.7 TWh
—
#3
California
245.9 TWh
—
#4
Pennsylvania
242.5 TWh
—
#5
Illinois
186.7 TWh
—
#6
Ohio
143.3 TWh
—
#7
Alabama
142.9 TWh
—
#8
Georgia
140.4 TWh
—
#9
North Carolina
135.9 TWh
—
#10
New York
133.5 TWh
—
#11
Michigan
124.5 TWh
—
#12
Arizona
121.5 TWh
—
#13
Virginia
103.7 TWh
—
#14
Washington
103 TWh
—
#15
South Carolina
101.1 TWh
—
#16
Louisiana
100 TWh
—
#17
Indiana
97.4 TWh
—
#18
Oklahoma
94.3 TWh
—
#19
Mississippi
77.4 TWh
—
#20
Tennessee
76.3 TWh
—
#21
Iowa
70.9 TWh
—
#22
Missouri
67.6 TWh
—
#23
Kentucky
67.1 TWh
—
#24
Wisconsin
65.6 TWh
—
#25
Oregon
65.3 TWh
—
#26
New Jersey
63.6 TWh
—
#27
Arkansas · your comparison
62.1 TWh
—
#28
Colorado
60.8 TWh
—
#29
Minnesota
59 TWh
—
#30
Kansas
57.9 TWh
—
#31
West Virginia
50.7 TWh
—
#32
Nevada
47.6 TWh
—
#33
Connecticut
46.2 TWh
—
#34
North Dakota
42.6 TWh
—
#35
Wyoming
40.7 TWh
—
#36
New Mexico
40.5 TWh
—
#37
Nebraska
37.3 TWh
—
#38
Maryland
36.9 TWh
—
#39
Utah
36.1 TWh
—
#40
Montana
27 TWh
—
#41
Massachusetts
25 TWh
—
#42
South Dakota
20.9 TWh
—
#43
Idaho
20.3 TWh
—
#44
New Hampshire
17.3 TWh
—
#45
Maine
15.7 TWh
—
#46
Hawaii
10.7 TWh
—
#47
Rhode Island
10.1 TWh
—
#48
Alaska
6.7 TWh
—
#49
Delaware
5 TWh
—
#50
Vermont
2.5 TWh
—
All 50 states are listed, including states without a comparable observation. Ranks use stored source precision; displayed values may round to the same number.
Natural-gas share of in-state electricity generation
39.8%2024
Natural-gas generation as a share of electricity generated at Arkansas facilities, including estimated small-scale solar in the statewide denominator.
This source snapshot keeps its own definition and period. A rank shown elsewhere applies only to that comparison’s measure and period.
EIA generation totals
Natural gas
24,725,307 MWh
Total, including small-scale solar
62,053,722 MWh
Other major shares
Coal
25.2%
Nuclear
23.8%
Solar
4.6%
Method and limitations
Calculated from EIA's 2024 Arkansas workbook: Table 5 natural-gas generation divided by Table 5 total electric-industry generation plus Table 19 estimated small-scale solar generation, rounded to one decimal place.
The shares are calculated from annual generation and rounded to one decimal; the displayed categories do not show every source.
In-state generation is not the same as electricity consumed in Arkansas because power crosses state lines.
Outage comparisons use the same reporting standard. Major-event outages and ordinary-day outages use different EIA reporting definitions.
Arkansas · 2024527.8 min/year
Arkansas rank#17among all 50 states
U.S. benchmark662.6 min/yearSame measure and period when published
#1 is the highest value. Ties share a rank and leave gaps. D.C. and territories are excluded. Rank describes the measured value; it is not an overall score of the state.
Outage minutes per customer · all events
EIA distribution-system reliability for utilities using the IEEE standard. SAIDI is average customer interruption duration; SAIFI is average frequency.
Reported customer coverage is incomplete and differs by state. These figures cover reporting utilities, not every customer. Major-event definitions follow IEEE; a severe-weather year can dominate the all-events value. Coverage percentage is not itself outage performance.
Hover to inspect. Click or tap to compare that period with every state. Focus the graph and use arrow keys, Home or End to select a period. Press Escape to return to the latest period.
Arkansas
2024 · Arkansas: 527.8 min/year · Rank #17 of 50, highest first · U.S. benchmark: 662.6 min/year · Selected for state comparisonView history and select a period
Arkansas Outage minutes per customer · all events history
Period
Arkansas
Compare
2023
915.3 min/year
2024
527.8 min/year
Compare states on the graph
Hover or focus a bar to inspect its value and rank. Use the up and down arrows, Home or End to explore states. Click, tap or press Enter to keep a state selected. Arkansas stays highlighted. Values use the same measure and period.
Explore the map: hover or focus a state to inspect it, then click or tap to select it. Arrow keys move between states alphabetically. Arkansas has a dark outline.
Lower value · 83.6 min/yearHigher value · 3,155 min/yearStriped: unavailable
Color shows this measure’s value, not an overall state score. Select a state on the map, graph or dropdown to read its value, rank and comparison limits below.
Arkansas · 527.8 min/year2024 · Rank #17 of 50, highest firstSelected state
50 states shown · scroll to explore every state. Missing values have no bar and are excluded from ranks. Bars start at zero; #1 means the highest value.
Compare Arkansas with every state · 50 ranked
Outage minutes per customer · all events · 2024 · highest value ranked #1
Rank
State
Value
Comparison notes
#1
South Carolina
3,155 min/year
—
#2
Maine
1,748.6 min/year
—
#3
Texas
1,614.3 min/year
—
#4
North Carolina
1,518.1 min/year
—
#5
Florida
1,487.6 min/year
—
#6
Georgia
1,208.1 min/year
—
#7
West Virginia
1,165.5 min/year
—
#8
Virginia
962.1 min/year
—
#9
Vermont
895.8 min/year
—
#10
New Hampshire
735.5 min/year
—
#11
Nebraska
697.8 min/year
—
#12
Washington
643.5 min/year
—
#13
Louisiana
630.6 min/year
—
#14
Mississippi
607.3 min/year
—
#15
Oregon
579.3 min/year
—
#16
Kentucky
537.7 min/year
—
#17
Arkansas · your comparison
527.8 min/year
—
#18
Ohio
511 min/year
—
#19
Michigan
481.7 min/year
—
#20
New York
477.3 min/year
—
#21
Hawaii
382.6 min/year
—
#22
Pennsylvania
353.1 min/year
—
#23
Montana
341.7 min/year
—
#24
Alaska
323.2 min/year
—
#25
Indiana
310 min/year
—
#26
Wisconsin
296.8 min/year
—
#27
Kansas
289.8 min/year
—
#28
Tennessee
289.3 min/year
—
#29
California
285 min/year
—
#30
New Mexico
272.6 min/year
—
#31
Colorado
257 min/year
—
#32
Minnesota
222.4 min/year
—
#33
Oklahoma
220.7 min/year
—
#34
Missouri
212.6 min/year
—
#35
Idaho
204.4 min/year
—
#36
Iowa
200.3 min/year
—
#37
Alabama
197.7 min/year
—
#38
New Jersey
173.3 min/year
—
#39
Nevada
158.9 min/year
—
#40
Illinois
158 min/year
—
#41
Connecticut
152.8 min/year
—
#42
Wyoming
137.8 min/year
—
#43
Maryland
118.1 min/year
—
#44
Delaware
117.9 min/year
—
#45
Utah
115.4 min/year
—
#46
Rhode Island
104.3 min/year
—
#47
Massachusetts
103.7 min/year
—
#48
North Dakota
102.7 min/year
—
#49
South Dakota
85.6 min/year
—
#50
Arizona
83.6 min/year
—
All 50 states are listed, including states without a comparable observation. Ranks use stored source precision; displayed values may round to the same number.
Total energy consumption includes more than electricity. EIA assigns electricity-related losses to consuming end-use sectors.
Arkansas · 2024209.5 trillion Btu
Arkansas rank#29among all 50 states
U.S. benchmark18,424 trillion BtuSame measure and period when published
#1 is the highest value. Ties share a rank and leave gaps. D.C. and territories are excluded. Rank describes the measured value; it is not an overall score of the state.
Residential energy consumption
Annual energy consumption by end-use sector, in trillion British thermal units (Btu).
2024 SEDS estimates. Industrial and total figures exclude noncombustible renewable energy inputs used to produce biofuels. Includes allocated electric-system energy losses. Size, climate, industry mix, and activity affect absolute rankings.
Compare states on the graph
Hover or focus a bar to inspect its value and rank. Use the up and down arrows, Home or End to explore states. Click, tap or press Enter to keep a state selected. Arkansas stays highlighted. Values use the same measure and period.
Explore the map: hover or focus a state to inspect it, then click or tap to select it. Arrow keys move between states alphabetically. Arkansas has a dark outline.
Lower value · 29.5 trillion BtuHigher value · 1,514 trillion BtuStriped: unavailable
Color shows this measure’s value, not an overall state score. Select a state on the map, graph or dropdown to read its value, rank and comparison limits below.
Arkansas · 209.5 trillion Btu2024 · Rank #29 of 50, highest firstSelected state
50 states shown · scroll to explore every state. Missing values have no bar and are excluded from ranks. Bars start at zero; #1 means the highest value.
Compare Arkansas with every state · 50 ranked
Residential energy consumption · 2024 · highest value ranked #1
Rank
State
Value
Comparison notes
#1
Texas
1,514 trillion Btu
—
#2
Florida
1,183.3 trillion Btu
—
#3
California
1,147.1 trillion Btu
—
#4
New York
968.3 trillion Btu
—
#5
Pennsylvania
819.3 trillion Btu
—
#6
Illinois
817.1 trillion Btu
—
#7
Ohio
767.4 trillion Btu
—
#8
Georgia
717.1 trillion Btu
—
#9
North Carolina
662.2 trillion Btu
—
#10
Michigan
661.4 trillion Btu
—
#11
New Jersey
550.1 trillion Btu
—
#12
Virginia
526 trillion Btu
—
#13
Tennessee
492 trillion Btu
—
#14
Indiana
475.6 trillion Btu
—
#15
Missouri
459 trillion Btu
—
#16
Arizona
413.7 trillion Btu
—
#17
Massachusetts
379 trillion Btu
—
#18
Wisconsin
375.9 trillion Btu
—
#19
South Carolina
370.7 trillion Btu
—
#20
Maryland
357.2 trillion Btu
—
#21
Minnesota
346.2 trillion Btu
—
#22
Alabama
331.6 trillion Btu
—
#23
Washington
330.2 trillion Btu
—
#24
Kentucky
319 trillion Btu
—
#25
Colorado
311.9 trillion Btu
—
#26
Louisiana
282.6 trillion Btu
—
#27
Connecticut
235.3 trillion Btu
—
#28
Oklahoma
231 trillion Btu
—
#29
Arkansas · your comparison
209.5 trillion Btu
—
#30
Utah
190.7 trillion Btu
—
#31
Mississippi
179.7 trillion Btu
—
#32
Oregon
173.1 trillion Btu
—
#33
Kansas
166.4 trillion Btu
—
#34
Iowa
162 trillion Btu
—
#35
Nevada
153.3 trillion Btu
—
#36
West Virginia
141 trillion Btu
—
#37
Nebraska
128.9 trillion Btu
—
#38
Idaho
111.2 trillion Btu
—
#39
New Mexico
98.1 trillion Btu
—
#40
New Hampshire
91.8 trillion Btu
—
#41
Maine
80.5 trillion Btu
—
#42
Montana
73.9 trillion Btu
—
#43
Delaware
62.6 trillion Btu
—
#44
North Dakota
61.3 trillion Btu
—
#45
Rhode Island
61 trillion Btu
—
#46
Alaska
49.1 trillion Btu
—
#47
Wyoming
45.5 trillion Btu
—
#48
South Dakota
44.2 trillion Btu
—
#49
Vermont
32.7 trillion Btu
—
#50
Hawaii
29.5 trillion Btu
—
All 50 states are listed, including states without a comparable observation. Ranks use stored source precision; displayed values may round to the same number.
Combustion emissions describe fossil energy use. Production, consumption, emissions, and international trade have different accounting boundaries.
Arkansas · 202458.42 Mt CO₂
Arkansas rank#29among all 50 states
U.S. benchmark4,780.66 Mt CO₂Same measure and period when published
#1 is the highest value. Ties share a rank and leave gaps. D.C. and territories are excluded. Rank describes the measured value; it is not an overall score of the state.
Total energy-related CO₂ emissions
Thousand metric tons of carbon dioxide from energy consumption.
2024 SEDS estimates. Energy-related CO₂ excludes non-energy greenhouse gases and is not a complete climate footprint. Production emissions are assigned to electric power, rather than reallocating electricity emissions to consumers.
Compare states on the graph
Hover or focus a bar to inspect its value and rank. Use the up and down arrows, Home or End to explore states. Click, tap or press Enter to keep a state selected. Arkansas stays highlighted. Values use the same measure and period.
Explore the map: hover or focus a state to inspect it, then click or tap to select it. Arrow keys move between states alphabetically. Arkansas has a dark outline.
Lower value · 5.36 Mt CO₂Higher value · 679.93 Mt CO₂Striped: unavailable
Color shows this measure’s value, not an overall state score. Select a state on the map, graph or dropdown to read its value, rank and comparison limits below.
Arkansas · 58.42 Mt CO₂2024 · Rank #29 of 50, highest firstSelected state
50 states shown · scroll to explore every state. Missing values have no bar and are excluded from ranks. Bars start at zero; #1 means the highest value.
Compare Arkansas with every state · 50 ranked
Total energy-related CO₂ emissions · 2024 · highest value ranked #1
Rank
State
Value
Comparison notes
#1
Texas
679.93 Mt CO₂
—
#2
California
315.98 Mt CO₂
—
#3
Florida
230.85 Mt CO₂
—
#4
Pennsylvania
201.57 Mt CO₂
—
#5
Louisiana
186.89 Mt CO₂
—
#6
Ohio
186.34 Mt CO₂
—
#7
Illinois
163.98 Mt CO₂
—
#8
New York
163.69 Mt CO₂
—
#9
Indiana
152.3 Mt CO₂
—
#10
Michigan
143.11 Mt CO₂
—
#11
Georgia
127.83 Mt CO₂
—
#12
North Carolina
119.07 Mt CO₂
—
#13
Kentucky
106.87 Mt CO₂
—
#14
Alabama
104.32 Mt CO₂
—
#15
Virginia
99.24 Mt CO₂
—
#16
Missouri
98.03 Mt CO₂
—
#17
Tennessee
90.46 Mt CO₂
—
#18
Oklahoma
88.56 Mt CO₂
—
#19
New Jersey
87.84 Mt CO₂
—
#20
Wisconsin
85.12 Mt CO₂
—
#21
Arizona
82.2 Mt CO₂
—
#22
Colorado
79.57 Mt CO₂
—
#23
Minnesota
77.89 Mt CO₂
—
#24
Washington
73.81 Mt CO₂
—
#25
West Virginia
72.28 Mt CO₂
—
#26
South Carolina
70.81 Mt CO₂
—
#27
Iowa
65.23 Mt CO₂
—
#28
Mississippi
64.75 Mt CO₂
—
#29
Arkansas · your comparison
58.42 Mt CO₂
—
#30
Massachusetts
58.07 Mt CO₂
—
#31
North Dakota
55.15 Mt CO₂
—
#32
Kansas
55.09 Mt CO₂
—
#33
Utah
55.03 Mt CO₂
—
#34
Wyoming
50 Mt CO₂
—
#35
Maryland
48.77 Mt CO₂
—
#36
Alaska
44.01 Mt CO₂
—
#37
Nebraska
43.54 Mt CO₂
—
#38
New Mexico
41.63 Mt CO₂
—
#39
Nevada
39.28 Mt CO₂
—
#40
Oregon
38.94 Mt CO₂
—
#41
Connecticut
37.09 Mt CO₂
—
#42
Montana
27.16 Mt CO₂
—
#43
Idaho
21.11 Mt CO₂
—
#44
Hawaii
17.96 Mt CO₂
—
#45
Maine
15.99 Mt CO₂
—
#46
South Dakota
15.11 Mt CO₂
—
#47
New Hampshire
13.6 Mt CO₂
—
#48
Delaware
11.52 Mt CO₂
—
#49
Rhode Island
11.05 Mt CO₂
—
#50
Vermont
5.36 Mt CO₂
—
All 50 states are listed, including states without a comparable observation. Ranks use stored source precision; displayed values may round to the same number.
Explore current officeholders and explicitly reviewed historical executive officials, labeled at the time of their actions. Timeline dates, action type, status and search also filter this list. Read any record’s summary, latest recorded status and official evidence below, or open it beside the timeline.
4 of 4 reviewed Arkansas actions · newest first
Apr 15, 2026 · S 3034 · Reliable Power Act · In CongressU.S. Congress · Arkansas delegation · S 3034
Reliable Power Act
Apr 15, 2026 · In Congress
Sen. Tom Cotton · Sponsored
FactVote reviewed summary
S 3034 would require annual long-term bulk-power reliability assessments covering the generation mix, transmission and demand. After a notice of generation inadequacy, specified federal regulations affecting generation would require FERC review and a determination about reliability before finalization. This concerns generation oversight, not a gas-generation quota or a verified change in Arkansas output. The covered regulations are those under development or consideration when the agency receives notice. Finalization requires both a written agency response and FERC’s determination that a significant negative reliability impact is unlikely.
Committee on Energy and Natural Resources Subcommittee on Energy. Hearings held. With printed Hearing: S.Hrg. 119-366. No enactment of this bill is recorded at the review cutoff.
Why this record is included
Natural-gas share is the portion of electricity generated at Arkansas facilities supplied by natural gas. Natural-gas output is the numerator and total in-state generation is the denominator. Policies concerning natural-gas or competing generation technologies can concern this mix; in-state generation differs from electricity consumed in the state. Procurement targets and authorizations are distinct from operating plants or measured output. This connection does not establish causation. Actions after the measurement period cannot explain the earlier observed value.
Retained Arkansas evidence context: Natural-gas share of in-state electricity generation. This record’s connection to the topic does not establish an effect on the measured result.
2. Commission review and comment for covered agency actions Section 215 of the Federal Power Act (16 U.S.C. 824o) is amended— (1) in subsection (g)— (A) by striking The ERO and inserting the following: (1) In general The ERO ; and (B) by adding at the end the following: (2) Annual long-term assessment The assessments under paragraph (1) shall include an annual long-term assessment, which shall include— (A) an analysis of the ability of the bulk-power system to supply sufficient electric energy to maintain an adequate level of reliability, taking into account— (i) generation resource mix; (ii) transmission development; and (iii) electric energy demand trends; (B) an analysis of— (i) the risk of future electric energy supply shortfalls under normal and extreme weather conditions; and (ii) the risk of any such shortfalls within each region of the bulk-power system; and (C) a determination of whether additional generation resources are necessary to supply sufficient electric energy to maintain an adequate level of reliability during the assessment period. (3) Notice of generation inadequacy In conducting a long-term assessment under paragraph (2), if the ERO determines that the bulk-power system is at risk of not having adequate generation resources to supply sufficient electric energy to maintain an adequate level of reliability, the ERO shall publicly notify the Commission that the bulk-power system is in a state of generation inadequacy. (4) Data collection To conduct a long-term assessment under paragraph (2), the ERO may collect information and data from users, owners, and operators of the bulk-power system. ; (2) by redesignating subsections (h) through (k) as subsections (i) through (l), respectively; and (3) by inserting after subsection (g) the following: (h) Commission review and comment for covered agency actions (1) Definitions In this subsection: (A) Covered agency action The term covered agency action means a regulation that— (i) relates to, or otherwise directly affects, any generation resource in the bulk-power system; and (ii) on the date on which the applicable Federal agency receives notice from the Commission under paragraph (2)— (I) is under development to be proposed; or (II) is otherwise under consideration in a rulemaking proceeding. (B) Federal agency The term Federal agency means an Executive department (as defined in section 101 of title 5, United States Code) or any other Executive agency the head of which holds a Cabinet-level position. (2) Notice to Federal agencies If the ERO notifies the Commission under subsection (g)(3) that the bulk-power system is in a state of generation inadequacy, the Commission shall promptly notify the Department of Energy, the Environmental Protection Agency, and any other Federal agency the Commission determines appropriate of that state of generation inadequacy. (3) Submission of covered agency actions to the Commission (A) In general Not later than the applicable date described in subparagraph (B), the head of each Federal agency that receives a notification under paragraph (2) shall submit to the Commission for review and comment any covered agency action of the Federal agency. (B) Date described The date referred to in subparagraph (A) is— (i) the first date on which the applicable covered agency action is provided to the Office of Management and Budget or any other Federal agency for review and comment; (ii) if the applicable covered agency action is not provided to the Office of Management and Budget or any other Federal agency for review and comment, the date that is 90 days before the date on which the covered agency action is published in the Federal Register or otherwise made available for public inspection or comment; or (iii) if, as of the date on which the Federal agency receives the applicable notification under paragraph (2), the covered agency action has already been provided to the Office of Management and Budget or any other Federal agency for review and comment, or has already been published in the Federal Register or otherwise made available for public inspection or comment, the date that is 60 days after the date on which the Federal agency received the notification. (4) Commission comments The Commission, in consultation with the ERO and transmission organizations, shall, by order, provide to the Federal agency head that submitted to the Commission a covered agency action under paragraph (3)— (A) comments on the covered agency action, which may include an assessment of the effect of the covered agency action on rates, terms, and conditions for services pursuant to the authority of the Commission under sections 201 and 206; and (B) if applicable, recommendations for modifications to the covered agency action to prevent a significant negative impact on the ability of the bulk-power system to supply sufficient electric energy to maintain an adequate level of reliability. (5) Agency response The head of a Federal agency may not finalize a covered agency action that is submitted to the Commission under paragraph (3) until— (A) the agency head responds in writing to the Commission with an explanation of how the agency head modified, or why the agency head determined not to modify, the covered agency action in response to any comments and recommendations provided by the Commission under paragraph (4); and (B) the Commission determines that the covered agency action is not likely to have a significant negative impact on the ability of the bulk-power system to supply sufficient electric energy to maintain an adequate level of reliability. (6) Public availability of comments and responses A Federal agency head shall include any comments, recommendations, and responses relating to the covered agency action under paragraphs (4) and (5) in— (A) any submission of the covered agency action to the Federal Register for publication; and (B) any other place in which the covered agency action is otherwise made available for public inspection or comment. .
Inspect this action on the timeline ↑Mar 20, 2026 · S 4158 · A bill to temporarily suspend the clean electricity production credit to support the Strategic Petroleum Reserve. · In CongressU.S. Congress · Arkansas delegation · S 4158
A bill to temporarily suspend the clean electricity production credit to support the Strategic Petroleum Reserve.
Mar 20, 2026 · In Congress
Sen. Tom Cotton · Sponsored
FactVote reviewed summary
S 4158 would suspend the section 45Y clean-electricity production credit for electricity produced from October 1, 2025 through September 30, 2027, and direct amounts equal to the resulting federal revenue increase into the Strategic Petroleum Reserve Petroleum Account. The proposal concerns generation incentives and petroleum reserves; it does not order a gasoline-price reduction or prove an actual reserve purchase.
Read twice and referred to the Committee on Finance. No enactment of this bill is recorded at the review cutoff.
Why this record is included
Natural-gas share is the portion of electricity generated at Arkansas facilities supplied by natural gas. Natural-gas output is the numerator and total in-state generation is the denominator. Policies concerning natural-gas or competing generation technologies can concern this mix; in-state generation differs from electricity consumed in the state. Procurement targets and authorizations are distinct from operating plants or measured output. The proposal changes incentives for competing electricity generation and therefore concerns the denominator of natural gas’s share, without establishing measured output. This connection does not establish causation or a change in the earlier measured value.
Retained Arkansas evidence context: Natural-gas share of in-state electricity generation · Gulf Coast regular gasoline price. This record’s connection to the topic does not establish an effect on the measured result.
1.Temporary suspension of clean electricity production credit(a)In generalSection 45Y of the Internal Revenue Code of 1986 is amended by adding at the end the following:(i)Suspension during fiscal years 2026 and 2027This section shall not apply with respect to any electricity produced during the period beginning on October 1, 2025, and ending on September 30, 2027..(b)Transfer to SPR petroleum accountThe Secretary of the Treasury shall deposit into the SPR Petroleum Account established under section 167(a) of the Energy Policy and Conservation Act (42 U.S.C. 6247(a)) amounts equal to the increase in revenues to the Treasury by reason of the amendment made by subsection (a).
Inspect this action on the timeline ↑Apr 21, 2025 · SB 596 · AN ACT TO AMEND THE LAW REGARDING ENERGY; TO ESTABLISH A STATE ENERGY POLICY; TO REGULATE RETIREMENT OF DISPATCHABLE ELECTRIC GENERATION FACILITIES; TO DECLARE AN EMERGENCY; AND FOR OTHER PURPOSES. · SignedGovernor · SB 596
AN ACT TO AMEND THE LAW REGARDING ENERGY; TO ESTABLISH A STATE ENERGY POLICY; TO REGULATE RETIREMENT OF DISPATCHABLE ELECTRIC GENERATION FACILITIES; TO DECLARE AN EMERGENCY; AND FOR OTHER PURPOSES.
Apr 21, 2025 · Signed
Gov. Sarah Huckabee Sanders · Signed
FactVote reviewed summary
Sarah Huckabee Sanders signed SB 596. Sarah Huckabee Sanders signed SB 596. SB 596 requires commission approval before a public utility retires a dispatchable generating facility of at least 100 MW located in Arkansas, including natural-gas facilities. It creates a rebuttable presumption against retirement, with replacement-capacity, reliability and cost findings, and exceptions for specified earlier litigation resolutions. It concerns the generation mix; approval requirements do not prove continued output or a change in natural gas’s measured share. The commission receives thirty days’ notice of an application and must issue an order within 180 days after receiving an administratively complete application. The act’s emergency clause made it effective upon approval on April 21, 2025; that does not establish approval of an individual retirement.
Signed by Sarah Huckabee Sanders on 2025-04-21; Act 940 of 2025. Enactment, effective dates, implementation and current enforceability are distinct.
Why this record is included
Natural-gas share is the portion of electricity generated at Arkansas facilities supplied by natural gas. Natural-gas output is the numerator and total in-state generation is the denominator. Policies concerning natural-gas or competing generation technologies can concern this mix; in-state generation differs from electricity consumed in the state. Procurement targets and authorizations are distinct from operating plants or measured output. This connection does not establish causation. Actions after the measurement period cannot explain the earlier observed value.
Retained Arkansas evidence context: Natural-gas share of in-state electricity generation. This record’s connection to the topic does not establish an effect on the measured result.
23-18-1302. Definitions. As used in this subchapter: (1) “Dispatchable” means a source of electrical power generation or biomass energy that is: (A) Available on demand; (B) Not intermittent; and (C) Can either: (i) Be adjusted to increase or decrease its power output upon request of a power grid operator or otherwise upon demand or request of a power grid operator; or (ii) Have its power output adjusted in response to market or system needs; (2) "Dispatchable electric generation facility" means a facility that uses water, coal, natural gas, geothermal, biomass, or nuclear power, or a combination of equivalent fuels and technologies to generate dispatchable, reliable electricity to provide to end users; (3) "Electric generation asset" means a plant, facility, As Engrossed: S4/7/25 S4/14/25 SB596 5 04-14-2025 19:32:40 ANS459 equipment, or system that converts nonelectrical energy into electricity; (4) "Intermittent" means: (A) A source of electrical power generation from a solar photovoltaic, solar thermal heating, concentrating solar thermal collector, or other solar energy collection or generation system; (B) A source of electrical power that generates energy by harnessing wind power or energy, whether through a turbine or other device; (C) Anaerobic digestion or combined heat and power from solar, wind, or anaerobic digestion sources; (D) Any short-duration energy storage, which includes any method of storing generated electricity for later dispatch to the power grid, whether alone or in conjunction with any other intermittent sources described in this subdivision (4), that is equivalent to less than forty-eight (48) hours of the average peak generation of the unit the short-duration energy storage is used to offset; and (E) Conventional hydropower and pumped storage hydropower, unless they are capable of providing energy on demand, in which case they shall be deemed to be dispatchable; (5) “Public utility” means the same as defined in § 23-1-101; (6) "Reliability" means having adequate dispatchable electric generation capacity to safely deliver electrical energy in the quantity, with the quality, and at a time that public utility customers demand; (7) "Resilience" means having the ability to quickly and effectively respond to and recover from events that compromise power grid reliability; (8) "Retirement" means the closure or the complete and permanent cessation of operations of a dispatchable electric generation facility; and (9) "Secure" means to harden to a reasonable extent against an attack, including a cyberattack or a kinetic attack, or an extreme weather event. 23-18-1303. Retirement of dispatchable electric generation facilities. (a)(1) Notwithstanding any provision of law to the contrary, the Arkansas Public Service Commission may approve or deny the retirement of a dispatchable electric generation facility owned by a public utility. (2) Before retiring a dispatchable electric generation facility, As Engrossed: S4/7/25 S4/14/25 SB596 6 04-14-2025 19:32:40 ANS459 a public utility shall: (A) Apply to the commission for an order approving the retirement; and (B) Give the commission thirty-days' notice of the application. (3) The application shall include a statement certifying the applicant's compliance with the requirements of this subchapter. (4) The commission shall enter an order within one hundred eighty (180) days of receiving an administratively complete application to approve the application for retirement to: (A) Approve the application for retirement; (B) Approve the application for retirement with conditions; or (C) Deny the application for retirement. (b)(1) There is a rebuttable presumption against the retirement of a dispatchable electric generation facility. (2) The commission shall not approve the retirement of a dispatchable electric generation facility, authorize a surcharge for the decommissioning of the dispatchable electric generation facility, or take any other action that authorizes or allows for the recovery of costs for the retirement of a dispatchable electric generation facility, including without limitation any stranded asset recovery, unless the presumption under subdivision (b)(1) of this section is rebutted by evidence sufficient for the commission to find that the retirement is in the public interest, including without limitation evidence that: (A) The public utility will replace the retired dispatchable electric generation facility with new electric generation assets that: (i) Are dispatchable by either the public utility or the regional transmission organization or independent system operator responsible for balancing load within the public utility's service area; (ii) Maintain or improve the reliability and resilience of the power grid; (iii) Maintain the minimum reserve capacity requirement established by the public utility's reliability coordinator; and (iv) Have the same or higher capacity value and net As Engrossed: S4/7/25 S4/14/25 SB596 7 04-14-2025 19:32:40 ANS459 capability, unless the public utility can demonstrate that the capacity value and net capability is not necessary to provide reliable service; (B) The retirement will not harm the public utility's ratepayers by causing the public utility to incur any net incremental costs to be recovered from ratepayers that could be avoided by continuing to operate the dispatchable electric generation facility proposed for retirement in compliance with applicable law; (C) The decision to retire the dispatchable electric generation facility is not the result of any financial incentives or benefits offered by a United States Government agency; and (D) The public utility will not commence retirement or decommissioning of the electric generating unit until the replacement generating capacity meeting the requirements of subdivision (b)(2)(A) of this section is fully constructed, permitted, and in operation, unless the public utility can demonstrate that it is necessary under the circumstances to commence retirement or decommissioning of the existing electric generating unit earlier. (c) At a minimum, the public utility shall provide the commission with evidence of all known direct and indirect costs of retiring the dispatchable electric generation facility and demonstrate that cost savings will result to customers as a result of the retirement of the dispatchable electric generation facility. (d)(1) Under the commission's report under § 23-18-1104, the commission shall prepare and submit an annual supplemental report to the Joint Committee on Energy no later than December 1 of each year in which the commission issues an order on an application under this subchapter. (2) The annual supplemental report required under subdivision (d)(1) of this section shall include: (A) The number of applications by public utilities to retire dispatchable electric generation facilities, the nameplate capacity of each of the dispatchable electric generation facilities, and whether the application was approved, approved with conditions, or denied; (B) The impact of any commission-approved retirement or retirement with conditions of a dispatchable electric generation facility on the: (i) State's electric generation fuel mix; As Engrossed: S4/7/25 S4/14/25 SB596 8 04-14-2025 19:32:40 ANS459 (ii) Required capacity reserve margins for the public utility; (iii) Need for capacity additions or expansions at new or existing facilities as a result of the retirement; and (iv) Need for additional purchase power or capacity reserve arrangements; and (C) Whether or not the retirement or retirement with conditions resulted in stranded costs for the ratepayer that will be recovered by the public utility through a surcharge or some other separate charge on the ratepayer's bill. (e) This section is applicable to a dispatchable electric generation facility that is one hundred megawatts (100 MW) or larger located in Arkansas. (f) This subchapter does not apply to the retirement or repowering of a dispatchable electric generation facility under any settlement, consent decree, or other resolution of any litigation or legal proceeding executed or ordered before the effective date of this subchapter. SECTION 3. EMERGENCY CLAUSE. It is found and determined by the General Assembly of the State of Arkansas that the continued unabated retirement of needed electric generating resources threatens to harm employment, tax revenue, and utility rates and is creating a crisis with respect to the state's ability to meet current and projected future energy demands; that this act will manage the retirement of needed electric generating resources for this state; and that this act is immediately necessary because continued electric generating resources are necessary for employment, tax revenue, and regular utility rates. Therefore, an emergency is declared to exist, and this act being immediately necessary for the preservation of the public peace, health, and safety shall become effective on: (1) The date of its approval by the Governor; (2) If the bill is neither approved nor vetoed by the Governor, the expiration of the period of time during which the Governor may veto the bill; or (3) If the bill is vetoed by the Governor and the veto is overridden, the date the last house overrides the veto. As Engrossed: S4/7/25 S4/14/25 SB596 9 04-14-2025 19:32:40 ANS459
Inspect this action on the timeline ↑Apr 21, 2025 · SB 596 · AN ACT TO AMEND THE LAW REGARDING ENERGY; TO ESTABLISH A STATE ENERGY POLICY; TO REGULATE RETIREMENT OF DISPATCHABLE ELECTRIC GENERATION FACILITIES; TO DECLARE AN EMERGENCY; AND FOR OTHER PURPOSES. · EnactedArkansas Legislature · SB 596
AN ACT TO AMEND THE LAW REGARDING ENERGY; TO ESTABLISH A STATE ENERGY POLICY; TO REGULATE RETIREMENT OF DISPATCHABLE ELECTRIC GENERATION FACILITIES; TO DECLARE AN EMERGENCY; AND FOR OTHER PURPOSES.
Apr 21, 2025 · Enacted
Sen. Matt McKee · Sponsored / Rep. Mindy McAlindon · Sponsored
FactVote reviewed summary
SB 596 requires commission approval before a public utility retires a dispatchable generating facility of at least 100 MW located in Arkansas, including natural-gas facilities. It creates a rebuttable presumption against retirement, with replacement-capacity, reliability and cost findings, and exceptions for specified earlier litigation resolutions. It concerns the generation mix; approval requirements do not prove continued output or a change in natural gas’s measured share. The commission receives thirty days’ notice of an application and must issue an order within 180 days after receiving an administratively complete application. The act’s emergency clause made it effective upon approval on April 21, 2025; that does not establish approval of an individual retirement.
Signed by Sarah Huckabee Sanders on 2025-04-21; Act 940 of 2025. Enactment, effective dates, implementation and current enforceability are distinct.
Why this record is included
Natural-gas share is the portion of electricity generated at Arkansas facilities supplied by natural gas. Natural-gas output is the numerator and total in-state generation is the denominator. Policies concerning natural-gas or competing generation technologies can concern this mix; in-state generation differs from electricity consumed in the state. Procurement targets and authorizations are distinct from operating plants or measured output. This connection does not establish causation. Actions after the measurement period cannot explain the earlier observed value.
Retained Arkansas evidence context: Natural-gas share of in-state electricity generation. This record’s connection to the topic does not establish an effect on the measured result.
23-18-1302. Definitions. As used in this subchapter: (1) “Dispatchable” means a source of electrical power generation or biomass energy that is: (A) Available on demand; (B) Not intermittent; and (C) Can either: (i) Be adjusted to increase or decrease its power output upon request of a power grid operator or otherwise upon demand or request of a power grid operator; or (ii) Have its power output adjusted in response to market or system needs; (2) "Dispatchable electric generation facility" means a facility that uses water, coal, natural gas, geothermal, biomass, or nuclear power, or a combination of equivalent fuels and technologies to generate dispatchable, reliable electricity to provide to end users; (3) "Electric generation asset" means a plant, facility, As Engrossed: S4/7/25 S4/14/25 SB596 5 04-14-2025 19:32:40 ANS459 equipment, or system that converts nonelectrical energy into electricity; (4) "Intermittent" means: (A) A source of electrical power generation from a solar photovoltaic, solar thermal heating, concentrating solar thermal collector, or other solar energy collection or generation system; (B) A source of electrical power that generates energy by harnessing wind power or energy, whether through a turbine or other device; (C) Anaerobic digestion or combined heat and power from solar, wind, or anaerobic digestion sources; (D) Any short-duration energy storage, which includes any method of storing generated electricity for later dispatch to the power grid, whether alone or in conjunction with any other intermittent sources described in this subdivision (4), that is equivalent to less than forty-eight (48) hours of the average peak generation of the unit the short-duration energy storage is used to offset; and (E) Conventional hydropower and pumped storage hydropower, unless they are capable of providing energy on demand, in which case they shall be deemed to be dispatchable; (5) “Public utility” means the same as defined in § 23-1-101; (6) "Reliability" means having adequate dispatchable electric generation capacity to safely deliver electrical energy in the quantity, with the quality, and at a time that public utility customers demand; (7) "Resilience" means having the ability to quickly and effectively respond to and recover from events that compromise power grid reliability; (8) "Retirement" means the closure or the complete and permanent cessation of operations of a dispatchable electric generation facility; and (9) "Secure" means to harden to a reasonable extent against an attack, including a cyberattack or a kinetic attack, or an extreme weather event. 23-18-1303. Retirement of dispatchable electric generation facilities. (a)(1) Notwithstanding any provision of law to the contrary, the Arkansas Public Service Commission may approve or deny the retirement of a dispatchable electric generation facility owned by a public utility. (2) Before retiring a dispatchable electric generation facility, As Engrossed: S4/7/25 S4/14/25 SB596 6 04-14-2025 19:32:40 ANS459 a public utility shall: (A) Apply to the commission for an order approving the retirement; and (B) Give the commission thirty-days' notice of the application. (3) The application shall include a statement certifying the applicant's compliance with the requirements of this subchapter. (4) The commission shall enter an order within one hundred eighty (180) days of receiving an administratively complete application to approve the application for retirement to: (A) Approve the application for retirement; (B) Approve the application for retirement with conditions; or (C) Deny the application for retirement. (b)(1) There is a rebuttable presumption against the retirement of a dispatchable electric generation facility. (2) The commission shall not approve the retirement of a dispatchable electric generation facility, authorize a surcharge for the decommissioning of the dispatchable electric generation facility, or take any other action that authorizes or allows for the recovery of costs for the retirement of a dispatchable electric generation facility, including without limitation any stranded asset recovery, unless the presumption under subdivision (b)(1) of this section is rebutted by evidence sufficient for the commission to find that the retirement is in the public interest, including without limitation evidence that: (A) The public utility will replace the retired dispatchable electric generation facility with new electric generation assets that: (i) Are dispatchable by either the public utility or the regional transmission organization or independent system operator responsible for balancing load within the public utility's service area; (ii) Maintain or improve the reliability and resilience of the power grid; (iii) Maintain the minimum reserve capacity requirement established by the public utility's reliability coordinator; and (iv) Have the same or higher capacity value and net As Engrossed: S4/7/25 S4/14/25 SB596 7 04-14-2025 19:32:40 ANS459 capability, unless the public utility can demonstrate that the capacity value and net capability is not necessary to provide reliable service; (B) The retirement will not harm the public utility's ratepayers by causing the public utility to incur any net incremental costs to be recovered from ratepayers that could be avoided by continuing to operate the dispatchable electric generation facility proposed for retirement in compliance with applicable law; (C) The decision to retire the dispatchable electric generation facility is not the result of any financial incentives or benefits offered by a United States Government agency; and (D) The public utility will not commence retirement or decommissioning of the electric generating unit until the replacement generating capacity meeting the requirements of subdivision (b)(2)(A) of this section is fully constructed, permitted, and in operation, unless the public utility can demonstrate that it is necessary under the circumstances to commence retirement or decommissioning of the existing electric generating unit earlier. (c) At a minimum, the public utility shall provide the commission with evidence of all known direct and indirect costs of retiring the dispatchable electric generation facility and demonstrate that cost savings will result to customers as a result of the retirement of the dispatchable electric generation facility. (d)(1) Under the commission's report under § 23-18-1104, the commission shall prepare and submit an annual supplemental report to the Joint Committee on Energy no later than December 1 of each year in which the commission issues an order on an application under this subchapter. (2) The annual supplemental report required under subdivision (d)(1) of this section shall include: (A) The number of applications by public utilities to retire dispatchable electric generation facilities, the nameplate capacity of each of the dispatchable electric generation facilities, and whether the application was approved, approved with conditions, or denied; (B) The impact of any commission-approved retirement or retirement with conditions of a dispatchable electric generation facility on the: (i) State's electric generation fuel mix; As Engrossed: S4/7/25 S4/14/25 SB596 8 04-14-2025 19:32:40 ANS459 (ii) Required capacity reserve margins for the public utility; (iii) Need for capacity additions or expansions at new or existing facilities as a result of the retirement; and (iv) Need for additional purchase power or capacity reserve arrangements; and (C) Whether or not the retirement or retirement with conditions resulted in stranded costs for the ratepayer that will be recovered by the public utility through a surcharge or some other separate charge on the ratepayer's bill. (e) This section is applicable to a dispatchable electric generation facility that is one hundred megawatts (100 MW) or larger located in Arkansas. (f) This subchapter does not apply to the retirement or repowering of a dispatchable electric generation facility under any settlement, consent decree, or other resolution of any litigation or legal proceeding executed or ordered before the effective date of this subchapter. SECTION 3. EMERGENCY CLAUSE. It is found and determined by the General Assembly of the State of Arkansas that the continued unabated retirement of needed electric generating resources threatens to harm employment, tax revenue, and utility rates and is creating a crisis with respect to the state's ability to meet current and projected future energy demands; that this act will manage the retirement of needed electric generating resources for this state; and that this act is immediately necessary because continued electric generating resources are necessary for employment, tax revenue, and regular utility rates. Therefore, an emergency is declared to exist, and this act being immediately necessary for the preservation of the public peace, health, and safety shall become effective on: (1) The date of its approval by the Governor; (2) If the bill is neither approved nor vetoed by the Governor, the expiration of the period of time during which the Governor may veto the bill; or (3) If the bill is vetoed by the Governor and the veto is overridden, the date the last house overrides the veto. As Engrossed: S4/7/25 S4/14/25 SB596 9 04-14-2025 19:32:40 ANS459
Records come from published fact relationships or reviewed topic records with official supporting evidence and verified Arkansas officeholder attribution. Historical executive officials require evidence tied to the action date and are excluded from incumbent proposals. Inclusion follows an explicit topic review, a related state fact, or the action’s title and supporting evidence. Explicit topic reviews take priority; repeated actions use the most recent explicit review for this topic. Duplicate actions attached to several facts appear once. This topic match is not a new finding that an action caused a result, and the reviewed collection is selective. Collection reviewed Oct 5, 2026.
What candidates are saying
Explore statements about electricity, fuels, energy costs and emissions from FactVote’s Arkansas candidate profiles. Compare candidates within each recorded race, with each person’s matching statements kept together. These are candidate and campaign statements, not verified outcomes.
10 statements from 6 candidates
2026 Arkansas Commissioner of State Lands — General Election
1 candidate with matching statements · 1 statement
Tax Relief I support giving real significant tax relief to Arkansans, not the token $10 per year the GOP has been touting. Arkansas has the second highest state and local sales tax rate in the US. Worse than New York or California. That’s inexcusable. I propose that we lower the state sales tax rate…
Read exact statement & source
Source topic or question: On The Issues
Candidate campaign source
Tax Relief I support giving real significant tax relief to Arkansans, not the token $10 per year the GOP has been touting. Arkansas has the second highest state and local sales tax rate in the US. Worse than New York or California. That’s inexcusable. I propose that we lower the state sales tax rate from 6.5% to a more reasonable 5%. That’s small but real and noticeable savings on utility bills, clothing, school supplies, etc…, nearly everything we purchase. Furthermore I would also propose we remove the local sales tax on food, diapers, and feminine hygiene products; a savings for Arkansas families that would be considerably greater than the minuscule 1/8th of a percent cut on food passed last year. The national standard deduction for income taxes is $15,750. In Arkansas the standard deduction is only $2,470. I propose that we increase the state standard deduction for each filer and dependent to the same $15,750 used for federal tax filers. This would be a substantial savings for working class families in Arkansas, and would require a very minimal change to the tax code.
Statement date not recorded · Profile reviewed Sep 16, 2026
Arkansas has the second highest state and local sales tax rate in the US. Worse than New York or California. That’s inexcusable. I propose that we lower the state sales tax rate from 6.5% to a more reasonable 5%. That’s small but real and noticeable savings on utility bills, clothing, school supplie…
Read exact statement & source
Source topic or question: Economy, taxes, spending, and affordability
Candidate campaign source
Arkansas has the second highest state and local sales tax rate in the US. Worse than New York or California. That’s inexcusable. I propose that we lower the state sales tax rate from 6.5% to a more reasonable 5%. That’s small but real and noticeable savings on utility bills, clothing, school supplies, etc…, nearly everything we purchase. Furthermore I would also propose we remove the local sales tax on food, diapers, and feminine hygiene products; a savings for Arkansas families that would be considerably greater than the minuscule 1/8th of a percent cut on food passed last year.
Statement date not recorded · Profile reviewed Sep 16, 2026
Increase the availability of safe, affordable housing options for homeowners, renters, and first-time buyers while also bringing energy costs within the home down.
Read exact statement & source
Source topic or question: WHAT I WILL DO:
Candidate campaign source
Increase the availability of safe, affordable housing options for homeowners, renters, and first-time buyers while also bringing energy costs within the home down.
Statement date not recorded · Profile reviewed Sep 17, 2026
To fight inflation and reduce everyday expenses, French introduced the Price Stability Act to lower costs on essentials like groceries and gasoline and to force the government to focus on reducing inflation. He also backed the Lower Healthcare Premiums for All Americans Act to reduce insurance costs…
Read exact statement & source
Source topic or question: French on the Issues
Candidate campaign source
To fight inflation and reduce everyday expenses, French introduced the Price Stability Act to lower costs on essentials like groceries and gasoline and to force the government to focus on reducing inflation. He also backed the Lower Healthcare Premiums for All Americans Act to reduce insurance costs and make healthcare more affordable for working families.
Statement date not recorded · Profile reviewed Sep 19, 2026
This section matches specific electricity, fuels, energy costs and emissions terms in retained, attributed source text from published Arkansas candidate profiles. A profile heading or biography alone does not qualify. The Florida geography is fixed; saved state preferences cannot change these results. A mention can concern a community or group rather than Florida’s statewide measure.
Matching is automatic and does not establish a candidate’s stance, the accuracy of a claim, or an effect on the measured result. Results are grouped by recorded race, then by candidate name. Within each candidate, the matching issue mentions appear first. Only candidates with matching retained statements are shown; this is not a complete race roster. Repeated identical text for the same candidate is shown once. Coverage follows the existing state profiles and is not a complete record of all candidates or everything they have said. Review dates are not statement dates.
Arkansas incumbents
What incumbents are proposing
Explore reviewed bills sponsored by current Arkansas legislators and Arkansas’s congressional delegation, plus retained proposals from Arkansas’s governor and agencies. Each record keeps its latest recorded status and official evidence.
4 matching sponsorships or proposals · 3 Arkansas incumbents. These filters apply only to this section.
Rep. Mindy McAlindon
Arkansas House of Representatives, District 10 · R–AR
AN ACT TO AMEND THE LAW REGARDING ENERGY; TO ESTABLISH A STATE ENERGY POLICY; TO REGULATE RETIREMENT OF DISPATCHABLE ELECTRIC GENERATION FACILITIES; TO DECLARE AN EMERGENCY; AND FOR OTHER PURPOSES.
Apr 21, 2025 · Enacted
Sen. Matt McKee · Sponsored / Rep. Mindy McAlindon · Sponsored
FactVote reviewed summary
SB 596 requires commission approval before a public utility retires a dispatchable generating facility of at least 100 MW located in Arkansas, including natural-gas facilities. It creates a rebuttable presumption against retirement, with replacement-capacity, reliability and cost findings, and exceptions for specified earlier litigation resolutions. It concerns the generation mix; approval requirements do not prove continued output or a change in natural gas’s measured share. The commission receives thirty days’ notice of an application and must issue an order within 180 days after receiving an administratively complete application. The act’s emergency clause made it effective upon approval on April 21, 2025; that does not establish approval of an individual retirement.
Signed by Sarah Huckabee Sanders on 2025-04-21; Act 940 of 2025. Enactment, effective dates, implementation and current enforceability are distinct.
Why this record is included
Natural-gas share is the portion of electricity generated at Arkansas facilities supplied by natural gas. Natural-gas output is the numerator and total in-state generation is the denominator. Policies concerning natural-gas or competing generation technologies can concern this mix; in-state generation differs from electricity consumed in the state. Procurement targets and authorizations are distinct from operating plants or measured output. This connection does not establish causation. Actions after the measurement period cannot explain the earlier observed value.
Retained Arkansas evidence context: Natural-gas share of in-state electricity generation. This record’s connection to the topic does not establish an effect on the measured result.
23-18-1302. Definitions. As used in this subchapter: (1) “Dispatchable” means a source of electrical power generation or biomass energy that is: (A) Available on demand; (B) Not intermittent; and (C) Can either: (i) Be adjusted to increase or decrease its power output upon request of a power grid operator or otherwise upon demand or request of a power grid operator; or (ii) Have its power output adjusted in response to market or system needs; (2) "Dispatchable electric generation facility" means a facility that uses water, coal, natural gas, geothermal, biomass, or nuclear power, or a combination of equivalent fuels and technologies to generate dispatchable, reliable electricity to provide to end users; (3) "Electric generation asset" means a plant, facility, As Engrossed: S4/7/25 S4/14/25 SB596 5 04-14-2025 19:32:40 ANS459 equipment, or system that converts nonelectrical energy into electricity; (4) "Intermittent" means: (A) A source of electrical power generation from a solar photovoltaic, solar thermal heating, concentrating solar thermal collector, or other solar energy collection or generation system; (B) A source of electrical power that generates energy by harnessing wind power or energy, whether through a turbine or other device; (C) Anaerobic digestion or combined heat and power from solar, wind, or anaerobic digestion sources; (D) Any short-duration energy storage, which includes any method of storing generated electricity for later dispatch to the power grid, whether alone or in conjunction with any other intermittent sources described in this subdivision (4), that is equivalent to less than forty-eight (48) hours of the average peak generation of the unit the short-duration energy storage is used to offset; and (E) Conventional hydropower and pumped storage hydropower, unless they are capable of providing energy on demand, in which case they shall be deemed to be dispatchable; (5) “Public utility” means the same as defined in § 23-1-101; (6) "Reliability" means having adequate dispatchable electric generation capacity to safely deliver electrical energy in the quantity, with the quality, and at a time that public utility customers demand; (7) "Resilience" means having the ability to quickly and effectively respond to and recover from events that compromise power grid reliability; (8) "Retirement" means the closure or the complete and permanent cessation of operations of a dispatchable electric generation facility; and (9) "Secure" means to harden to a reasonable extent against an attack, including a cyberattack or a kinetic attack, or an extreme weather event. 23-18-1303. Retirement of dispatchable electric generation facilities. (a)(1) Notwithstanding any provision of law to the contrary, the Arkansas Public Service Commission may approve or deny the retirement of a dispatchable electric generation facility owned by a public utility. (2) Before retiring a dispatchable electric generation facility, As Engrossed: S4/7/25 S4/14/25 SB596 6 04-14-2025 19:32:40 ANS459 a public utility shall: (A) Apply to the commission for an order approving the retirement; and (B) Give the commission thirty-days' notice of the application. (3) The application shall include a statement certifying the applicant's compliance with the requirements of this subchapter. (4) The commission shall enter an order within one hundred eighty (180) days of receiving an administratively complete application to approve the application for retirement to: (A) Approve the application for retirement; (B) Approve the application for retirement with conditions; or (C) Deny the application for retirement. (b)(1) There is a rebuttable presumption against the retirement of a dispatchable electric generation facility. (2) The commission shall not approve the retirement of a dispatchable electric generation facility, authorize a surcharge for the decommissioning of the dispatchable electric generation facility, or take any other action that authorizes or allows for the recovery of costs for the retirement of a dispatchable electric generation facility, including without limitation any stranded asset recovery, unless the presumption under subdivision (b)(1) of this section is rebutted by evidence sufficient for the commission to find that the retirement is in the public interest, including without limitation evidence that: (A) The public utility will replace the retired dispatchable electric generation facility with new electric generation assets that: (i) Are dispatchable by either the public utility or the regional transmission organization or independent system operator responsible for balancing load within the public utility's service area; (ii) Maintain or improve the reliability and resilience of the power grid; (iii) Maintain the minimum reserve capacity requirement established by the public utility's reliability coordinator; and (iv) Have the same or higher capacity value and net As Engrossed: S4/7/25 S4/14/25 SB596 7 04-14-2025 19:32:40 ANS459 capability, unless the public utility can demonstrate that the capacity value and net capability is not necessary to provide reliable service; (B) The retirement will not harm the public utility's ratepayers by causing the public utility to incur any net incremental costs to be recovered from ratepayers that could be avoided by continuing to operate the dispatchable electric generation facility proposed for retirement in compliance with applicable law; (C) The decision to retire the dispatchable electric generation facility is not the result of any financial incentives or benefits offered by a United States Government agency; and (D) The public utility will not commence retirement or decommissioning of the electric generating unit until the replacement generating capacity meeting the requirements of subdivision (b)(2)(A) of this section is fully constructed, permitted, and in operation, unless the public utility can demonstrate that it is necessary under the circumstances to commence retirement or decommissioning of the existing electric generating unit earlier. (c) At a minimum, the public utility shall provide the commission with evidence of all known direct and indirect costs of retiring the dispatchable electric generation facility and demonstrate that cost savings will result to customers as a result of the retirement of the dispatchable electric generation facility. (d)(1) Under the commission's report under § 23-18-1104, the commission shall prepare and submit an annual supplemental report to the Joint Committee on Energy no later than December 1 of each year in which the commission issues an order on an application under this subchapter. (2) The annual supplemental report required under subdivision (d)(1) of this section shall include: (A) The number of applications by public utilities to retire dispatchable electric generation facilities, the nameplate capacity of each of the dispatchable electric generation facilities, and whether the application was approved, approved with conditions, or denied; (B) The impact of any commission-approved retirement or retirement with conditions of a dispatchable electric generation facility on the: (i) State's electric generation fuel mix; As Engrossed: S4/7/25 S4/14/25 SB596 8 04-14-2025 19:32:40 ANS459 (ii) Required capacity reserve margins for the public utility; (iii) Need for capacity additions or expansions at new or existing facilities as a result of the retirement; and (iv) Need for additional purchase power or capacity reserve arrangements; and (C) Whether or not the retirement or retirement with conditions resulted in stranded costs for the ratepayer that will be recovered by the public utility through a surcharge or some other separate charge on the ratepayer's bill. (e) This section is applicable to a dispatchable electric generation facility that is one hundred megawatts (100 MW) or larger located in Arkansas. (f) This subchapter does not apply to the retirement or repowering of a dispatchable electric generation facility under any settlement, consent decree, or other resolution of any litigation or legal proceeding executed or ordered before the effective date of this subchapter. SECTION 3. EMERGENCY CLAUSE. It is found and determined by the General Assembly of the State of Arkansas that the continued unabated retirement of needed electric generating resources threatens to harm employment, tax revenue, and utility rates and is creating a crisis with respect to the state's ability to meet current and projected future energy demands; that this act will manage the retirement of needed electric generating resources for this state; and that this act is immediately necessary because continued electric generating resources are necessary for employment, tax revenue, and regular utility rates. Therefore, an emergency is declared to exist, and this act being immediately necessary for the preservation of the public peace, health, and safety shall become effective on: (1) The date of its approval by the Governor; (2) If the bill is neither approved nor vetoed by the Governor, the expiration of the period of time during which the Governor may veto the bill; or (3) If the bill is vetoed by the Governor and the veto is overridden, the date the last house overrides the veto. As Engrossed: S4/7/25 S4/14/25 SB596 9 04-14-2025 19:32:40 ANS459
1 proposalView proposals from Sen. Matt McKeeArkansas Legislature · SB 596
AN ACT TO AMEND THE LAW REGARDING ENERGY; TO ESTABLISH A STATE ENERGY POLICY; TO REGULATE RETIREMENT OF DISPATCHABLE ELECTRIC GENERATION FACILITIES; TO DECLARE AN EMERGENCY; AND FOR OTHER PURPOSES.
Apr 21, 2025 · Enacted
Sen. Matt McKee · Sponsored / Rep. Mindy McAlindon · Sponsored
FactVote reviewed summary
SB 596 requires commission approval before a public utility retires a dispatchable generating facility of at least 100 MW located in Arkansas, including natural-gas facilities. It creates a rebuttable presumption against retirement, with replacement-capacity, reliability and cost findings, and exceptions for specified earlier litigation resolutions. It concerns the generation mix; approval requirements do not prove continued output or a change in natural gas’s measured share. The commission receives thirty days’ notice of an application and must issue an order within 180 days after receiving an administratively complete application. The act’s emergency clause made it effective upon approval on April 21, 2025; that does not establish approval of an individual retirement.
Signed by Sarah Huckabee Sanders on 2025-04-21; Act 940 of 2025. Enactment, effective dates, implementation and current enforceability are distinct.
Why this record is included
Natural-gas share is the portion of electricity generated at Arkansas facilities supplied by natural gas. Natural-gas output is the numerator and total in-state generation is the denominator. Policies concerning natural-gas or competing generation technologies can concern this mix; in-state generation differs from electricity consumed in the state. Procurement targets and authorizations are distinct from operating plants or measured output. This connection does not establish causation. Actions after the measurement period cannot explain the earlier observed value.
Retained Arkansas evidence context: Natural-gas share of in-state electricity generation. This record’s connection to the topic does not establish an effect on the measured result.
23-18-1302. Definitions. As used in this subchapter: (1) “Dispatchable” means a source of electrical power generation or biomass energy that is: (A) Available on demand; (B) Not intermittent; and (C) Can either: (i) Be adjusted to increase or decrease its power output upon request of a power grid operator or otherwise upon demand or request of a power grid operator; or (ii) Have its power output adjusted in response to market or system needs; (2) "Dispatchable electric generation facility" means a facility that uses water, coal, natural gas, geothermal, biomass, or nuclear power, or a combination of equivalent fuels and technologies to generate dispatchable, reliable electricity to provide to end users; (3) "Electric generation asset" means a plant, facility, As Engrossed: S4/7/25 S4/14/25 SB596 5 04-14-2025 19:32:40 ANS459 equipment, or system that converts nonelectrical energy into electricity; (4) "Intermittent" means: (A) A source of electrical power generation from a solar photovoltaic, solar thermal heating, concentrating solar thermal collector, or other solar energy collection or generation system; (B) A source of electrical power that generates energy by harnessing wind power or energy, whether through a turbine or other device; (C) Anaerobic digestion or combined heat and power from solar, wind, or anaerobic digestion sources; (D) Any short-duration energy storage, which includes any method of storing generated electricity for later dispatch to the power grid, whether alone or in conjunction with any other intermittent sources described in this subdivision (4), that is equivalent to less than forty-eight (48) hours of the average peak generation of the unit the short-duration energy storage is used to offset; and (E) Conventional hydropower and pumped storage hydropower, unless they are capable of providing energy on demand, in which case they shall be deemed to be dispatchable; (5) “Public utility” means the same as defined in § 23-1-101; (6) "Reliability" means having adequate dispatchable electric generation capacity to safely deliver electrical energy in the quantity, with the quality, and at a time that public utility customers demand; (7) "Resilience" means having the ability to quickly and effectively respond to and recover from events that compromise power grid reliability; (8) "Retirement" means the closure or the complete and permanent cessation of operations of a dispatchable electric generation facility; and (9) "Secure" means to harden to a reasonable extent against an attack, including a cyberattack or a kinetic attack, or an extreme weather event. 23-18-1303. Retirement of dispatchable electric generation facilities. (a)(1) Notwithstanding any provision of law to the contrary, the Arkansas Public Service Commission may approve or deny the retirement of a dispatchable electric generation facility owned by a public utility. (2) Before retiring a dispatchable electric generation facility, As Engrossed: S4/7/25 S4/14/25 SB596 6 04-14-2025 19:32:40 ANS459 a public utility shall: (A) Apply to the commission for an order approving the retirement; and (B) Give the commission thirty-days' notice of the application. (3) The application shall include a statement certifying the applicant's compliance with the requirements of this subchapter. (4) The commission shall enter an order within one hundred eighty (180) days of receiving an administratively complete application to approve the application for retirement to: (A) Approve the application for retirement; (B) Approve the application for retirement with conditions; or (C) Deny the application for retirement. (b)(1) There is a rebuttable presumption against the retirement of a dispatchable electric generation facility. (2) The commission shall not approve the retirement of a dispatchable electric generation facility, authorize a surcharge for the decommissioning of the dispatchable electric generation facility, or take any other action that authorizes or allows for the recovery of costs for the retirement of a dispatchable electric generation facility, including without limitation any stranded asset recovery, unless the presumption under subdivision (b)(1) of this section is rebutted by evidence sufficient for the commission to find that the retirement is in the public interest, including without limitation evidence that: (A) The public utility will replace the retired dispatchable electric generation facility with new electric generation assets that: (i) Are dispatchable by either the public utility or the regional transmission organization or independent system operator responsible for balancing load within the public utility's service area; (ii) Maintain or improve the reliability and resilience of the power grid; (iii) Maintain the minimum reserve capacity requirement established by the public utility's reliability coordinator; and (iv) Have the same or higher capacity value and net As Engrossed: S4/7/25 S4/14/25 SB596 7 04-14-2025 19:32:40 ANS459 capability, unless the public utility can demonstrate that the capacity value and net capability is not necessary to provide reliable service; (B) The retirement will not harm the public utility's ratepayers by causing the public utility to incur any net incremental costs to be recovered from ratepayers that could be avoided by continuing to operate the dispatchable electric generation facility proposed for retirement in compliance with applicable law; (C) The decision to retire the dispatchable electric generation facility is not the result of any financial incentives or benefits offered by a United States Government agency; and (D) The public utility will not commence retirement or decommissioning of the electric generating unit until the replacement generating capacity meeting the requirements of subdivision (b)(2)(A) of this section is fully constructed, permitted, and in operation, unless the public utility can demonstrate that it is necessary under the circumstances to commence retirement or decommissioning of the existing electric generating unit earlier. (c) At a minimum, the public utility shall provide the commission with evidence of all known direct and indirect costs of retiring the dispatchable electric generation facility and demonstrate that cost savings will result to customers as a result of the retirement of the dispatchable electric generation facility. (d)(1) Under the commission's report under § 23-18-1104, the commission shall prepare and submit an annual supplemental report to the Joint Committee on Energy no later than December 1 of each year in which the commission issues an order on an application under this subchapter. (2) The annual supplemental report required under subdivision (d)(1) of this section shall include: (A) The number of applications by public utilities to retire dispatchable electric generation facilities, the nameplate capacity of each of the dispatchable electric generation facilities, and whether the application was approved, approved with conditions, or denied; (B) The impact of any commission-approved retirement or retirement with conditions of a dispatchable electric generation facility on the: (i) State's electric generation fuel mix; As Engrossed: S4/7/25 S4/14/25 SB596 8 04-14-2025 19:32:40 ANS459 (ii) Required capacity reserve margins for the public utility; (iii) Need for capacity additions or expansions at new or existing facilities as a result of the retirement; and (iv) Need for additional purchase power or capacity reserve arrangements; and (C) Whether or not the retirement or retirement with conditions resulted in stranded costs for the ratepayer that will be recovered by the public utility through a surcharge or some other separate charge on the ratepayer's bill. (e) This section is applicable to a dispatchable electric generation facility that is one hundred megawatts (100 MW) or larger located in Arkansas. (f) This subchapter does not apply to the retirement or repowering of a dispatchable electric generation facility under any settlement, consent decree, or other resolution of any litigation or legal proceeding executed or ordered before the effective date of this subchapter. SECTION 3. EMERGENCY CLAUSE. It is found and determined by the General Assembly of the State of Arkansas that the continued unabated retirement of needed electric generating resources threatens to harm employment, tax revenue, and utility rates and is creating a crisis with respect to the state's ability to meet current and projected future energy demands; that this act will manage the retirement of needed electric generating resources for this state; and that this act is immediately necessary because continued electric generating resources are necessary for employment, tax revenue, and regular utility rates. Therefore, an emergency is declared to exist, and this act being immediately necessary for the preservation of the public peace, health, and safety shall become effective on: (1) The date of its approval by the Governor; (2) If the bill is neither approved nor vetoed by the Governor, the expiration of the period of time during which the Governor may veto the bill; or (3) If the bill is vetoed by the Governor and the veto is overridden, the date the last house overrides the veto. As Engrossed: S4/7/25 S4/14/25 SB596 9 04-14-2025 19:32:40 ANS459
2 proposalsView proposals from Sen. Tom CottonU.S. Congress · Arkansas delegation · S 3034
Reliable Power Act
Apr 15, 2026 · In Congress
Sen. Tom Cotton · Sponsored
FactVote reviewed summary
S 3034 would require annual long-term bulk-power reliability assessments covering the generation mix, transmission and demand. After a notice of generation inadequacy, specified federal regulations affecting generation would require FERC review and a determination about reliability before finalization. This concerns generation oversight, not a gas-generation quota or a verified change in Arkansas output. The covered regulations are those under development or consideration when the agency receives notice. Finalization requires both a written agency response and FERC’s determination that a significant negative reliability impact is unlikely.
Committee on Energy and Natural Resources Subcommittee on Energy. Hearings held. With printed Hearing: S.Hrg. 119-366. No enactment of this bill is recorded at the review cutoff.
Why this record is included
Natural-gas share is the portion of electricity generated at Arkansas facilities supplied by natural gas. Natural-gas output is the numerator and total in-state generation is the denominator. Policies concerning natural-gas or competing generation technologies can concern this mix; in-state generation differs from electricity consumed in the state. Procurement targets and authorizations are distinct from operating plants or measured output. This connection does not establish causation. Actions after the measurement period cannot explain the earlier observed value.
Retained Arkansas evidence context: Natural-gas share of in-state electricity generation. This record’s connection to the topic does not establish an effect on the measured result.
2. Commission review and comment for covered agency actions Section 215 of the Federal Power Act (16 U.S.C. 824o) is amended— (1) in subsection (g)— (A) by striking The ERO and inserting the following: (1) In general The ERO ; and (B) by adding at the end the following: (2) Annual long-term assessment The assessments under paragraph (1) shall include an annual long-term assessment, which shall include— (A) an analysis of the ability of the bulk-power system to supply sufficient electric energy to maintain an adequate level of reliability, taking into account— (i) generation resource mix; (ii) transmission development; and (iii) electric energy demand trends; (B) an analysis of— (i) the risk of future electric energy supply shortfalls under normal and extreme weather conditions; and (ii) the risk of any such shortfalls within each region of the bulk-power system; and (C) a determination of whether additional generation resources are necessary to supply sufficient electric energy to maintain an adequate level of reliability during the assessment period. (3) Notice of generation inadequacy In conducting a long-term assessment under paragraph (2), if the ERO determines that the bulk-power system is at risk of not having adequate generation resources to supply sufficient electric energy to maintain an adequate level of reliability, the ERO shall publicly notify the Commission that the bulk-power system is in a state of generation inadequacy. (4) Data collection To conduct a long-term assessment under paragraph (2), the ERO may collect information and data from users, owners, and operators of the bulk-power system. ; (2) by redesignating subsections (h) through (k) as subsections (i) through (l), respectively; and (3) by inserting after subsection (g) the following: (h) Commission review and comment for covered agency actions (1) Definitions In this subsection: (A) Covered agency action The term covered agency action means a regulation that— (i) relates to, or otherwise directly affects, any generation resource in the bulk-power system; and (ii) on the date on which the applicable Federal agency receives notice from the Commission under paragraph (2)— (I) is under development to be proposed; or (II) is otherwise under consideration in a rulemaking proceeding. (B) Federal agency The term Federal agency means an Executive department (as defined in section 101 of title 5, United States Code) or any other Executive agency the head of which holds a Cabinet-level position. (2) Notice to Federal agencies If the ERO notifies the Commission under subsection (g)(3) that the bulk-power system is in a state of generation inadequacy, the Commission shall promptly notify the Department of Energy, the Environmental Protection Agency, and any other Federal agency the Commission determines appropriate of that state of generation inadequacy. (3) Submission of covered agency actions to the Commission (A) In general Not later than the applicable date described in subparagraph (B), the head of each Federal agency that receives a notification under paragraph (2) shall submit to the Commission for review and comment any covered agency action of the Federal agency. (B) Date described The date referred to in subparagraph (A) is— (i) the first date on which the applicable covered agency action is provided to the Office of Management and Budget or any other Federal agency for review and comment; (ii) if the applicable covered agency action is not provided to the Office of Management and Budget or any other Federal agency for review and comment, the date that is 90 days before the date on which the covered agency action is published in the Federal Register or otherwise made available for public inspection or comment; or (iii) if, as of the date on which the Federal agency receives the applicable notification under paragraph (2), the covered agency action has already been provided to the Office of Management and Budget or any other Federal agency for review and comment, or has already been published in the Federal Register or otherwise made available for public inspection or comment, the date that is 60 days after the date on which the Federal agency received the notification. (4) Commission comments The Commission, in consultation with the ERO and transmission organizations, shall, by order, provide to the Federal agency head that submitted to the Commission a covered agency action under paragraph (3)— (A) comments on the covered agency action, which may include an assessment of the effect of the covered agency action on rates, terms, and conditions for services pursuant to the authority of the Commission under sections 201 and 206; and (B) if applicable, recommendations for modifications to the covered agency action to prevent a significant negative impact on the ability of the bulk-power system to supply sufficient electric energy to maintain an adequate level of reliability. (5) Agency response The head of a Federal agency may not finalize a covered agency action that is submitted to the Commission under paragraph (3) until— (A) the agency head responds in writing to the Commission with an explanation of how the agency head modified, or why the agency head determined not to modify, the covered agency action in response to any comments and recommendations provided by the Commission under paragraph (4); and (B) the Commission determines that the covered agency action is not likely to have a significant negative impact on the ability of the bulk-power system to supply sufficient electric energy to maintain an adequate level of reliability. (6) Public availability of comments and responses A Federal agency head shall include any comments, recommendations, and responses relating to the covered agency action under paragraphs (4) and (5) in— (A) any submission of the covered agency action to the Federal Register for publication; and (B) any other place in which the covered agency action is otherwise made available for public inspection or comment. .
A bill to temporarily suspend the clean electricity production credit to support the Strategic Petroleum Reserve.
Mar 20, 2026 · In Congress
Sen. Tom Cotton · Sponsored
FactVote reviewed summary
S 4158 would suspend the section 45Y clean-electricity production credit for electricity produced from October 1, 2025 through September 30, 2027, and direct amounts equal to the resulting federal revenue increase into the Strategic Petroleum Reserve Petroleum Account. The proposal concerns generation incentives and petroleum reserves; it does not order a gasoline-price reduction or prove an actual reserve purchase.
Read twice and referred to the Committee on Finance. No enactment of this bill is recorded at the review cutoff.
Why this record is included
Natural-gas share is the portion of electricity generated at Arkansas facilities supplied by natural gas. Natural-gas output is the numerator and total in-state generation is the denominator. Policies concerning natural-gas or competing generation technologies can concern this mix; in-state generation differs from electricity consumed in the state. Procurement targets and authorizations are distinct from operating plants or measured output. The proposal changes incentives for competing electricity generation and therefore concerns the denominator of natural gas’s share, without establishing measured output. This connection does not establish causation or a change in the earlier measured value.
Retained Arkansas evidence context: Natural-gas share of in-state electricity generation · Gulf Coast regular gasoline price. This record’s connection to the topic does not establish an effect on the measured result.
1.Temporary suspension of clean electricity production credit(a)In generalSection 45Y of the Internal Revenue Code of 1986 is amended by adding at the end the following:(i)Suspension during fiscal years 2026 and 2027This section shall not apply with respect to any electricity produced during the period beginning on October 1, 2025, and ending on September 30, 2027..(b)Transfer to SPR petroleum accountThe Secretary of the Treasury shall deposit into the SPR Petroleum Account established under section 167(a) of the Energy Policy and Conservation Act (42 U.S.C. 6247(a)) amounts equal to the increase in revenues to the Treasury by reason of the amendment made by subsection (a).
Only current Arkansas officeholders retained in the reviewed collection qualify. Bills require a recorded primary sponsorship; cosponsors and signing officials are excluded from sponsorship counts. An official introducer recorded as acting by request is labeled “Introduced by request”; that procedural role does not establish personal policy endorsement. Governor and agency records qualify when recorded as proposed. A separately verified governor transmittal can also establish an original proposal whose latest status reflects its later outcome. Signing an enacted law alone does not establish a proposal. A record appearing under several facts is counted once per officeholder. A bill with multiple primary sponsors appears under each recorded sponsor.
Enacted bills, adopted resolutions and unsuccessful measures remain visible as proposal history. Passing one chamber is not enactment. These counts do not measure effectiveness or prove that an action changed a Arkansas statistic. Collection reviewed Oct 5, 2026.
Sources & methods
Every section retains its primary sources, units, reporting periods and comparison limits. Maps, graphs and tables use the same observation and cohort. All 50 states are listed; D.C. and territories are excluded. Missing and suppressed values remain unavailable and never become zero.
#1 is the highest measured value. Equal source values share a rank and leave gaps (1, 2, 2, 4). Ranks use source precision and are descriptive, not a score of the state. Survey uncertainty and reporting coverage can limit comparisons. Published U.S. benchmarks are used where available; a state average is not substituted.
Arkansas snapshots and fiscal sources keep their own dates and accounting scope. National events and federal distribution explainers describe national context. Actions and statements are filtered to Arkansas, retain their reviewed evidence, and do not establish that a policy caused a measured change.
Retained state source collections assembled October 5, 2026. Original review and source dates remain visible. Refreshing this page does not refresh an official data release.